Manhole Frame

Quick Overview

Description

  • It’s a device for a manhole composed of two pieces made of charged PA :

    • A filling buffer for concrete
    • A frame with an external counterfoil
  • It is intended for a glance of the ground, allowing the direct access for the installation of lighting networks, draw or ground, telephone networks and networks of evacuation of rain water.

Avantages

  • Seal the frame horizontally in the pavement.
  • Position the solid pad in the frame with cords of about 1mm on all four sides of the pad.
  • Place the reinforcement on a concrete base then pour the whole of the buffer taking care to leave the reservation for the tiling if necessary.
  • —-

  • Finish the screed.
  • Tile the buffer.
  • Once the concrete is dry, you can open the frame with a screwdriver.
  • Resistance to the load depends on the nature of the reinforcement.
Categories : Frames

Related products

Top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.